-Gila Region Community News, Calendar, Forum-

Reader Supported Silver City News & SW New Mexico, Grant County NM, Gila NF
* Login   * Register

* FAQ    * Search

All times are UTC - 7 hours

News     Columns     Food: Growing, Fixing     Features     Water     Health     Business     Education     DIY & How-tos     Classifieds     Forum     Home 

Silver City Food Coop



We Are Reader Supported
Your recurring contribution goes to support the Forum, Calendar, and Email List, which exists to further local, sustainable, place-based community.
MONTHLY RECURRING GIFT
    Bill Me Now For: $

ONE-TIME GIFT
Bill Me Now For: $

You may also mail a check or cash to
Moses Clark
PO Box 1792
Silver City, N.M. 88062


Get your ad here








Post new topic Reply to topic  [ 1 post ] 
Author ------ Message
 Author: crow
PostPosted: Sun Aug 03, 2014 2:45 pm 
Image
Patching, Re-patching and Patching again and again and....

This Part 3b will investigate ongoing fixit plans and the costs involved. There are 71 Lane Miles of Town owned streets in the Town of Silver City; because some of them are 4 lanes we cannot simply say there are 35.5 miles of streets but something just under. These numbers do not include highways like Hudson St. (Highway 90) nor PA Road (Highway 15) which the Town is not responsible for maintaining but rather at the mercy of the State. Fortunately most streets aren't this bad but the cost of repair is astronomical and money from the State and the Feds, via the State, is constantly on the decline. Though, I'm using Silver City to tell a story, the issues also apply to the County and all of its municipalities and to a greater or lesser degree, all across the US.

In my last article (Pt 3a) announcing the upcoming 4 day Chip/Fog Seal project I didn't mention the cost but it will be about $500,000 for the 5 miles of streets, $100,000 per mile in an attempt to prolong the life of the pavement. The Photos herein show damage beyond Chip Seal capabilities and need to be removed and redone and because many streets were built without proper drainage and many streets in this condition also have sidewalks in the same condition (if there are sidewalks) many will be a "starting from scratch" project.

As an example of the approximate cost of a total rebuild I'll use an example of an upcoming project on Silver Street between Pine and Lamb which is 3 blocks. Approximate cost because every job has its variables. This Silver St project will, because the drainage needs fixing, entail removing the pavement and the base course and what sidewalks exist and starting over. One block is measured at 350 feet and each 350' costs $125,000 for this project; that cost would increase if bike lanes were installed but in this case there will not be any even though the street services 3 schools and is heavily used. What we get for this $375,000 assuming the price doesn't go up:

• 3 blocks of improved drainage with 6 inch base course
• 3 blocks of 2 lane street with parking on each side, 3 inch asphalt
• new curbs and gutters
• 4 ada ramps and railing at each intersection that has a complete rebuild
• sidewalks

Though the money from the state has been promised since sometime last winter it is still not here and may come when school is in session making for a difficult situation as the state expects it to be used asap after arriving. Since Gov Martinez has been in office money is tighter and no longer comes from the state in a timely manner, often taking a year or longer but to be fair it is not only her fault as money from the Feds to the States has also shrunk and takes longer to arrive, after all, the feds have bombs to build and Countries to attack with our money instead of using it for infrastructure and other benefits to its people.

About PA Rd, as promised.
PA Rd is State Highway 15 and therefore the NMDOT's sole responsibility but all is not lost. The Town has been talking with the State about what we want. For the section from Highway 180 to 32nd Street the NMDOT has set aside $4.5 Million for a compete rebuild to include bike lanes and ada sidewalks. According to Alex Brown, Town Manager, the project will start in FY 2016 he thought.

Image
Both Photos are of Market Street between Bullard and Cooper

In order to help pay for the increasing cost and increasing need for patching streets, a GRT tax increment that was devoted to help pay for water infrastructure was changed and devoted to streets, well half was devoted to streets and half was devoted to the General Fund and our water bills increased but our streets may receive more upkeep.

Links to previous articles in the Infrastructure Series-
Part 1 Paying Our Way
Part 2 Water, Who Pays
Part 3a Streets, Potholes,Decay


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 1 post ] 

All times are UTC - 7 hours


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:

Gila River Festival Ad


Silver City & Southwestern New Mexico Monthly Community Calendar

Click To Create A New Calendar Event
<<

Community Events
Week of September 26, 2018

>>

26
WILL Lunch and Learn
Put your Brain to Work - Gin Rummy
Wednesday Evening Al-Anon Family Group
27
28
Women Embracing Recovery: We-R Group
29
Free Library Card Replacement Day
13th Annual Mimbres Valley Harvest Festival
Music in the Gardens – Phoebe Hunt and the Gatherers
30
1
New Hope Al-Anon Family Group
2










News     Columns     Food: Growing, Fixing     Features     Water     Health     Business     Education     DIY & How-tos     Classifieds     Forum     Home 
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group